電氣成套使用中欠缺整體規(guī)劃與標準如何?您可以對比一下,看自身在應(yīng)用的電器設(shè)備存不會有這種須整頓的事項,下面小編為您講解。
What about the lack of overall planning and standards in the use of electrical complete sets? You can compare the electrical equipment you are using to see whether there is such a thing that needs to be rectified. The following sections will explain it for you.
1、欠缺控制系統(tǒng)設(shè)計與整體規(guī)劃
1. Lack of control system design and overall planning
①自動控制系統(tǒng)構(gòu)造:集中化與遍布,傳動系統(tǒng)與操縱,主控芯片與輔助,網(wǎng)絡(luò)架構(gòu),柜身合理布局等層面均未做了整體的考慮到。
① The structure of automatic control system: centralization and pervasiveness, transmission system and control, master control chip and auxiliary, network architecture, reasonable cabinet layout and other aspects have not been considered as a whole.
②網(wǎng)絡(luò)架構(gòu):沒有根據(jù)所明確的自動控制系統(tǒng)的構(gòu)造,整體規(guī)劃控制系統(tǒng)系統(tǒng)總線及通信網(wǎng)絡(luò),明確互聯(lián)網(wǎng)的構(gòu)造,傳輸方式,走線方式及走線間距。
② Network architecture: The control system bus and communication network were not planned as a whole according to the clear structure of the automatic control system, and the structure, transmission mode, routing mode and routing spacing of the Internet were defined.
③開關(guān)電源構(gòu)造:沒有根據(jù)所明確的自動控制系統(tǒng)的構(gòu)造,數(shù)據(jù)管理平臺的開關(guān)電源分派,沒有開關(guān)電源歸類按段,及其有關(guān)的維護,沒有浪涌保護器及過電流量維護。
③ Structure of switching power supply: there is no switching power supply distribution of data management platform, no switching power supply classification by segment, and its related maintenance, no surge protector and over-current maintenance according to the specified structure of automatic control system.
④接地保護:沒有根據(jù)明確的自動控制系統(tǒng)構(gòu)造、網(wǎng)絡(luò)架構(gòu)、開關(guān)電源構(gòu)造明確系統(tǒng)軟件接地裝置構(gòu)造,沒有歸類,按段,分層次接地裝置的設(shè)計方案。
④ Grounding protection: the structure of the system software grounding device is not defined according to the clear structure of the automatic control system, network architecture and switching power supply, and the design scheme of the grounding device is not classified by sections and levels.
2、欠缺標準與規(guī)范,及統(tǒng)一的管理方法
2. Lack of standards and norms, and unified management methods
①沒有統(tǒng)一的設(shè)計規(guī)范。
① There is no uniform design specification.
②沒有標準的制圖標準。
② There is no standard drafting standard.
③沒有安裝成套設(shè)備技術(shù)標準。
③ There is no technical standard for installing the complete equipment.
④從系統(tǒng)軟件方面,電子器件方面,各種各樣型號選擇都欠缺恰當與精準的測算,片面性隨機性大。
④ In terms of system software and electronic components, all kinds of model choices lack proper and accurate measurement, and are highly one-sided and random.
⑤持續(xù)改善更無從說起。
⑤ There is no way to talk about continuous improvement.
The lack of overall planning and standard related content in the use of electrical complete sets will be explained here. If you have any ideas about this, please come to our website http://www.ywf-lanzhou.com Consult!